ICC carried out all the contact carpentry on this year long project for HW we built the stutters for the raft foundation erected the timber frame battened and insulated the whole of the building then sealed the building with black membrane.
ICC carried out all the contact carpentry on this year long project for HW we built the stutters for the raft foundation erected the timber frame battened and insulated the whole of the building then sealed the building with black membrane.
We also installed all of the VELFAC windows clad the whole building and with larch with equal spacing making for a stunning effect.
Copyrights © 2024 Web design by Responsive web design Ipswich Suffolk